8.08B.110 General Permit Application Contents
A.
Every
Permit application shall be on a format supplied by the Department and shall
contain the following information:
1.
Contact
information for the Facility owner, and the Facility operator and property owner
if different, including contact name, company name, mailing address, phone fax,
and e-mail;
2.
Identification
of the type of Facility that is to be Permitted;
3.
Identification
of any other Permit (local, state or federal) in effect at the site;
4.
A
vicinity plan or map (having a minimum scale of 1:24,000) that shall show the
area within one mile (1.6 km) of the property boundaries of the Facility in
terms of the existing and proposed zoning and land uses within that area,
residences, and access roads, and other existing and proposed man-made or
natural features that may impact the operation of the Facility;
5.
Evidence
of compliance with chapter 197-11 WAC, SEPA rules;
6.
Information
as required under the appropriate Facility Permit application subsection of this
chapter; and
7.
Any
additional information as requested by the Health Department or the Department.
B.
Engineering
plans, reports, specifications, programs, and manuals submitted to the Health
Department or the Department shall be prepared and certified by an individual
licensed to practice engineering in the state of Washington, in an engineering
discipline appropriate for the Solid Waste Facility type or activity.
C.
Signature
and verification of applicants:
1.
All
applications for Permits shall be accompanied by evidence of authority to sign
the application and shall be signed by the owner or operator as follows:
a)
In the
case of corporations, by a duly authorized principal executive officer of at
least the level of vice-president. In
the case of a partnership or limited partnership, by a general partner; in the
case of sole proprietorship, by the proprietor.
b)
In the
case of a municipal, state, or other government entity, by a duly authorized
principal executive officer or elected official.
2.
Applications
shall be signed or attested to by, or on behalf of, the owner or operator, in
respect to the veracity of all statements therein; or shall bear an executed
statement by, or on behalf of, the owner or operator to the effect that false
statements made therein are made under penalty of perjury.
3.
The
signature of the applicant shall be notarized on the Permit application form.